Free CSE practice questions

Thirteen questions for the California Supplemental Examination, one from each free lesson. We wrote them, and none is a real exam question.

Contract Development / Project Planning

K1: Architects Practice Act

An architect is preparing construction documents for a new three-story medical office building. The architect's employees work from their homes and from the firm's office in another country, and the architect sets the design direction, reviews the drawings as they develop and requests corrections. Which of the following statements about responsible control is correct?

  1. The work is under the architect's responsible control only if the architect also reviews the completed set
  2. The work is under the architect's responsible control because the architect directs it as it is prepared
  3. The work is not under the architect's responsible control because the employees work outside the office
  4. The work is under the architect's responsible control only if each employee signs a written agreement
Show the answer

B. Responsible control is control during preparation, and where the staff sit doesn't matter.

In the lesson: Responsible control

K2: Project scope & schedule

A new medical clinic requires a conditional use permit. During which phases of design should the entitlement normally be obtained?

  1. Schematic design and design development
  2. Design development and construction documents
  3. Construction documents, before plan check submittal
  4. Plan check, alongside the building permit review
Show the answer

A. Entitlements happen during schematic design and design development, so no money goes into construction documents before the project has permission.

In the lesson: Entitlement approval

K5: Contract types

Which American Institute of Architects (AIA) document sets out the duties of the owner, the contractor and the architect during construction?

  1. B101
  2. A101
  3. A201
  4. B102
Show the answer

C. A201 is the General Conditions, the rulebook for construction, with the duties of owner, contractor and architect.

In the lesson: Main agreements

K10: Project team responsibilities

During design development of a corporate headquarters, the owner's facilities manager directs the architect to specify carpet in the open office areas. The owner's finance director later directs resilient tile instead. Neither is the owner's authorized representative. What action should the architect take?

  1. Follow the later direction and notify the facilities manager in writing
  2. Follow the less costly direction and notify both staff members in writing
  3. Ask the owner's authorized representative to decide, and follow that decision
  4. Ask the owner's facilities manager to decide, and follow that decision
Show the answer

C. The owner names one authorized representative who can bind it. When owner staff conflict, the architect takes it to that person and follows the decision.

In the lesson: Owner responsibilities

Schematic Design / Discretionary Approvals

K21: CEQA

An architect is designing a new single-family house on a lot where the house is a permitted use. The only approval the project needs is a building permit, checked against fixed standards. The client asks how the California Environmental Quality Act (CEQA) will affect the schedule. Which of the following should the architect advise?

  1. The project is exempt, because every approval it needs is ministerial
  2. The project needs an Initial Study, because a building permit is required
  3. The project needs CEQA review, because it changes the physical environment
  4. The project is exempt only if it fits a categorical exemption class
Show the answer

A. A project that's entirely ministerial is exempt. One discretionary approval would change that.

In the lesson: When CEQA applies

K22: California Coastal Act

A coastal city has a certified Local Coastal Program (LCP). The architect is preparing the application for a new two-story office building on an inland street in the city's coastal zone, not on tidelands or public trust lands. Which of the following should issue the coastal development permit (CDP)?

  1. The California Coastal Commission
  2. The city, under its certified LCP
  3. The State Coastal Conservancy
  4. The city building department, with the building permit
Show the answer

B. After the Commission certifies the LCP, the city issues most CDPs.

In the lesson: Local Coastal Programs

K25: California Building Standards Code

An architect is coordinating a new three-story office building with the plumbing engineer and the fire protection engineer. The consultants ask which parts of Title 24 contain the California Plumbing Code and the California Fire Code. The architect should refer them to which of the following?

  1. Part 6 for the Plumbing Code and Part 9 for the Fire Code
  2. Part 5 for the Plumbing Code and Part 7 for the Fire Code
  3. Part 5 for the Plumbing Code and Part 9 for the Fire Code
  4. Part 6 for the Plumbing Code and Part 7 for the Fire Code
Show the answer

C. The Plumbing Code is Part 5 and the Fire Code is Part 9.

In the lesson: A. California Building Standards Code

K28: CALGreen

An owner plans a 1,200-square-foot addition to an existing one-story office building. The architect is preparing the CALGreen mandatory measures checklist for the permit application. Which of the following should the checklist cover?

  1. Construction waste diversion only, for the addition
  2. All of the nonresidential mandatory measures, for the addition only
  3. All of the nonresidential mandatory measures, for the addition and the existing building
  4. The Tier 1 voluntary measures, for the addition only
Show the answer

B. A nonresidential addition of 1,000 square feet or more is covered, and only the part being added has to comply.

In the lesson: When it applies

Design Development

K33: Integrating building systems

A one-story medical clinic will be conditioned by ductless split-system heat pumps that heat and cool recirculated room air. During design development, the owner asks the architect whether any other mechanical equipment is needed to meet the code. Which of the following should the architect recommend?

  1. Provide larger heat pumps so the recirculated air meets the outdoor air requirement
  2. Provide zoned controls for the exam rooms to meet the outdoor air requirement
  3. Provide a separate means of bringing in the outdoor air the code requires
  4. Confirm that the heat pumps alone meet the outdoor air requirement
Show the answer

C. Heating or cooling recirculated air doesn't bring in outdoor air, so the outdoor air the code requires needs its own path.

In the lesson: Energy management

K35: Site hazards

An owner purchases a parcel for a new two-story medical office building. Part of the parcel lies inside an Alquist-Priolo Earthquake Fault Zone, and the owner wants schematic design to start right away. Which of the following actions should the architect take?

  1. Locate the building just outside the zone boundary shown on the map
  2. Ask the owner to hire a licensed geologist to investigate the site for fault traces
  3. Ask the owner to hire a civil engineer to prepare a liquefaction and landslide report
  4. Ask the structural engineer to design a foundation that resists fault rupture
Show the answer

B. The zone triggers a geologic investigation by a licensed geologist before the permit. The owner hires it, and the footprint depends on what it finds.

In the lesson: Alquist-Priolo fault zones

Construction Documents / Permitting

K41: Working with regulatory agencies

Which of the following lists the approval steps for a new office building in the correct order?

  1. Plan check, entitlements, permit, inspections, certificate of occupancy
  2. Entitlements, plan check, inspections, permit, certificate of occupancy
  3. Entitlements, plan check, permit, inspections, certificate of occupancy
  4. Entitlements, permit, plan check, inspections, certificate of occupancy
Show the answer

C. Entitlements, then plan check, then the permit, inspections during construction and the certificate of occupancy after the final inspection.

In the lesson: From plan check to occupancy

Project Bidding and Construction

K46: Liens & payment protection

An architect designed a private restaurant building, and the city issued the building permit in March. In May the owner informed the architect in writing that the project is canceled and construction will not start. The architect's fees remain unpaid. Which of the following remedies is available to the architect?

  1. A mechanics lien, recorded within 90 days after the building permit was issued
  2. A design professional lien, recorded within 90 days after learning construction will not start
  3. A design professional lien, recorded within 90 days after the building permit was issued
  4. A mechanics lien, recorded within 90 days after learning construction will not start
Show the answer

B. Private project, permit issued, no construction, so it's the design lien. It's recorded within 90 days after the architect knows construction won't start.

In the lesson: Design-professional lien

K56: Observation, submittals & RFIs

Under A201, which of the following describes the role of the shop drawings the contractor submits?

  1. They show how the contractor plans to comply with the Contract Documents
  2. They become part of the Contract Documents once the architect approves them
  3. They replace the architect's drawings for the portion of the work they show
  4. They change the contract requirements wherever the architect approves them
Show the answer

A. A submittal shows how the contractor plans to meet the contract. It isn't a Contract Document, and reviewing it doesn't change the contract.

In the lesson: Submittal review

More questions

The thirteen free lessons have 192 quiz questions between them. The exam simulator has a free 35-question sample. The Study Pass has all 700 questions and four full exams.